How the pieces fit
Vote count, priority score and roadmap position are separate fields. A high score is a signal for your team, not a delivery commitment, and votes never set the score on their own.
How the score works
The priority score is the weighted benefit minus the weighted cost, on the same scale every time: 100 × (benefit − cost), shown with one decimal. For example, a request with a weighted benefit of 0.86 and a weighted cost of 0.40 scores 46.0.
- A request with a required factor missing is Unscored, not zero. It appears in its own group until the input is added.
- Changing a factor or weight previews the recalculation before it applies, and every request is rescored with the same version.
- Equal scores are ordered consistently, so the list doesn’t shuffle.
See Configure scoring factors for setup.
Use the matrix
The matrix plots cost horizontally and benefit vertically, with four quadrants from High benefit · low cost to Low benefit · high cost. Select a point to open its score explanation. A readable list beside the matrix shows the same data, and unscored requests are counted rather than plotted.
Set up the roadmap
Choose columns
Columns follow your workflow statuses. By default the roadmap shows Planned, In progress and Complete. Hide any column in Roadmap settings; hiding it doesn’t hide the requests elsewhere.
Order cards
Drag cards or use the move menu. Moderators and Brand Admins change the shared order.
Add cover images and descriptions
Optional card details make the public roadmap easier to scan.
See Set up and share your roadmap for topic views and the embedded roadmap.
Public and internal dates
Timeline targets have two modes. Internal dates are for your team. Public estimates are entered separately, can be a date, a date range or a quarter, and may be left empty. An internal deadline never fills in a public estimate.
Estimates stay honest
When a public estimate passes without delivery, the item is flagged for review. It doesn’t slide forward or become Complete on its own. Changing a public estimate shows before-and-after text and who would be told.